AMICA MUTUAL INSURANCE COMPANY, Corporate Headquarters, Building 25,
LINCOLN, RI 2001

Replaced patio walking surface and EPDM roofing membrane outside building 25 cafeteria. Removed old deteriorating concrete pavers and old roofing system. Installed new insulation, new EPDM membrane roofing system, and new concrete paver walking surface in architect designed color patterns. The project included new railings, planters, lighting and electrical connections for new heated walkmats.

2004 – Reroofed all flat roofs at Gastonbury, Conneticut Offices (7200 Sq Ft.)

2006 – Reroofed additional sections of Building 25 and field office in Lincoln, RI (61,100 Sq Ft.)

2006 – Reroofed 20 Blackstone Place (35,200 Sq Ft.)

 

AAi FOSTER GRANT
SMITHFIELD, RI 2001

2001 - Reroofed Middle Section, Approx 89,400 Sq. Ft. Removed old, aged membrane roof, installed new insulation, and new, white TPO membrane roofing system. Project included manufacturers 15 year labor and materials warranty.

 
B.A. BALLOU & CO.
EAST PROVIDENCE, RI – MAIN BUILDING

1996 – Completely tore off existing roofing and insulation and installed new insulation and Stevens EP membrane roof (104,000 Sq. Ft.).
2001 - New EPDM Roof on new addition (5400 Sq. Ft.).
2003 - Reroofed 830 Waterman Avenue (7600 Sq. Ft.).
 
CARDI’S FURNITURE
SWANSEA, MA

1995 – Replaced roof on a section of the warehouse and loading docks (66,200 Sq. Ft.).
1996 – Replaced roof on office and section of showroom (approximately 18,300 Sq. Ft.).
1997 – Installed roof on warehouse and loading dock expansion (46,200 Sq. Ft.).
 
EASTBROOK MALL
WILLIMANTIC, CT

2000 – Completely tore off two layers of roofing and installed new insulation and new Carlisle Sure-Weld membrane (193,200 Sq. Ft.).
 

JULIUS KOCH, INC.
NEW BEDFORD, MA

1995 – Installed new roof, skylights, and hatch on new addition (approximately 23,200 Sq. Ft.).

 
MIDDLETOWN SCHOOL DEPT.
MIDDLETOWN, RI

1996 – Reroofed a portion of Middletown High School and a portion of Gaudet Middle School (38,400 Sq. Ft.).
2002 - Reroofed Kennedy School (28,300 Sq. Ft.).
 
NEW ENGLAND ROPES
FALL RIVER, MA

1999 Phase I – Completely tore off a portion of existing roofing and installed new insulation and a Carlisle reinforced EPDM roofing system (62,300 Sq. Ft.).
2000 Phase II– Completely tore off a portion of existing roofing and installed new insulation and a Carlisle reinforced EPDM roofing system (50,000 Sq. Ft.).
2005 Phase III Reroofed Office Area (4400 Sq. Ft.).
2007 Phase IV Reroofed Tenant Space (27,500 Sq Ft.).
 
CALDOR STORES

1995 – Lincoln Mall – Installed a new Stevens membrane roof system over new insulation (107,700 Sq. Ft.).
1997 – Westboro, MA – Converted a metal roof to membrane using specially cut insulation and Stevens EP membrane (87,000 Sq. Ft.).
 

OCEAN STATE POWER

1998 – Control Room Roof and Turbine Hall – Installed new insulation and new Stevens EP membrane roof system (25,700 Sq. Ft.).
1999 – Injector Pump Buildings – Installed new insulation and new Stevens EP membrane roof system (2,200 Sq. Ft.).

 
FOXBORO COMPANY
FOXBORO, MA


1995 – Phase 1 (30,500 Sq. Ft.)
1995 – Phase 2 (15,600 Sq. Ft.)
1995 – Phase 3 (46,200 Sq. Ft.)
1996 – Phase 4 (150,000 Sq. Ft.)
1997 – Phase 5 (60,600 Sq. Ft.)
1998 – Phase 6 (72,000 Sq. Ft.)
1999 – Phase 7 (62,100 Sq. Ft.)
2000 – Phase 10 (20,300 Sq. Ft.)
2003 – Phase 11 (114,300 Sq. Ft.)
2004 – Phase 12 (662,000 Sq. Ft.)
2005 – Phase 13 (27,600 Sq. Ft.)
 

NORTH SAFETY PRODUCTS
CRANSTON, RI



2000 – 240,000 Sq. Ft. Reroofed entire facility with Stevens EP Roof membrane system, with new insulation.

 
NEW ENGLAND PEST CONTROL (BIG BLUE BUG)
PROVIDENCE, RI

1991 – Reroofed main building (approximately 9,000 Sq. Ft.). Converted metal roof to membrane roof with specially cut insulation. (This was one of the first Carlisle metal retrofit jobs to be done.)
 
SHAW’S SUPERMARKETS
RIVERSIDE, RI

2000 – Completely tore off existing roofing and installed new insulation and a new Carlisle Sure-Weld membrane roof system (24,500 Sq. Ft.).
2007 Reroofed Easton, Mass Super Shaw’s
2008 Phase II of Riverside, RI property
 
SPEIDEL
EAST PROVIDENCE, RI

2005 – Reroofed portion of Warehouse (49,600 Sq. Ft.).
 
BENJAMIN MOORE CO.
MILFORD, MA

1996 – Installed a new Stevens EP membrane roof system over new insulation on the upper roof (9,500 Sq. Ft.).
1997 – Installed a new Stevens EP membrane roof system over new insulation on building 72 (25,000 Sq. Ft.).
2000 – Installed a new Stevens EP membrane roof system over new insulation on the office roof (4,700 Sq. Ft.).
 
STANDARD THOMSON
WATERTOWN, MA

1994 – Phase 1 (36,600 Sq. Ft.)
1995 – Phase 2 (26,000 Sq. Ft)
1996 – Phase 3 (26,300 Sq. Ft.)
1998 – Phase 4 (7400 Sq. Ft.)
2002 – Engineering Building (12,800 Sq. Ft.)
2005 – Front Metal Roof (8000 Sq. Ft.)
 
NEWPORT GRAND JAI ALAI
NEWPORT, RI – MAIN BUILDING

1998 – Installed a new Stevens EP membrane roof system, tan colored, over new insulation (40,600 Sq. Ft.).
 
PRO CUT
WALTHAM, MA

1998 – Installed a new Stevens EP membrane roof system over new insulation (37,800 Sq. Ft.).
 
ALBEROX CORPORATION
NEW BEDFORD, MA

1998 – Installed a new Firestone EPDM ballasted membrane roof system over new insulation (49,500 Sq. Ft.).
 
HEATRON INC.
WARWICK, RI

1999 – Tore off roofing materials that contained asbestos, and installed new insulation and a new Stevens EP membrane roofing system (22,000 Sq. Ft.).
 
AUTOCRAT COFFEE
LINCOLN, RI

2004 – Reroofed original section of Main Building (29,200 Sq. Ft.).
 
RHODE ISLAND HOSPITAL
PROVIDENCE, RI

1990 – Installed a new Firestone ballasted EPDM membrane roof system over new insulation on several buildings (28,600 Sq. Ft.).
2000 – Tore off existing roof on the Capeway Building and installed a new fully adhered Carlisle EPDM membrane roof system (9,300 Sq. Ft.).
2002 - Reroofed Samuel's Dental Clinic (5200 Sq. Ft.).

 

WPRI-TV CHANNEL 12
EAST PROVIDENCE, RI

2001– Installed a new Stevens EP membrane roof system over new insulation on the entire facility (24,600 Sq. Ft.).
 
UNIVERSAL PRESS
PROVIDENCE, RI

1992 – Installed a new Stevens EP membrane roof system over new insulation on the front roof (22,500 Sq. Ft.).
1994 – Installed a new Stevens EP membrane roof system over new insulation on the bindery roof (17,000 Sq. Ft.).
1995 – Installed a new Stevens EP membrane roof system over new insulation on the upper roof (17,700 Sq. Ft.).
 
FALL RIVER FLORIST SUPPLY
FALL RIVER, MA

1997 – Reroofed Loading Dock (1200 Sq. Ft.).
2000 – Reroofed Sheds (11,300 Sq. Ft.).
2004 – Reroofed Main Building (40,700 Sq. Ft.).
 
GILBANE PROPERTIES
PROVIDENCE, RI

1993 – Tore off existing main roof at 7 Jackson Walkway and installed a new ballasted Carlisle EPDM membrane roof system over new insulation (17,600 Sq. Ft.).
2003 - Reroofed Narragansett Pier Village Market. Tore off existing roof, installed new 2.7" Iso Insulation and Carlisle Sure-Weld Membrane (11,600 Sq. Ft.).
 
BRYANT COLLEGE
SMITHFIELD, RI

1997 – Tore off existing roof of Dorm 6 and installed a fully adhered EPDM membrane roof system over new insulation (4,700 Sq. Ft.).
 
CITIZENS BANK
BARRINGTON, RI - NEW BRANCH BUILDING

1999 – Installed a new Carlisle Sure-Weld roofing system over new insulation (4,000 Sq. Ft.).
2007 - Reroofed portion of Operations Center, 10 Tripps Lane, in East Providence RI, (30,800 Sq Ft.).
 
NARRAGANSETT ELECTRIC
PROVIDENCE, RI

1995 – Installed new insulation, skylights, and a new fully adhered EPDM roof system on the Dyer Street substation (4,000 Sq. Ft.).
 
DUDEK BOWLING ALLEY
WARREN, RI

1993 – Installed a new Stevens EP membrane roofing system over new insulation on the main roof (12,500 Sq. Ft.).
 
NARRAGANSETT IMAGING
SLATERSVILLE, RI

2001 – Reroofed National Marker Building (42,200 Sq. Ft.).
2002 – Reroofed Main Building (43,700 Sq. Ft.).
 
NEWMAN YMCA
SEEKONK, MA

1999 – Installed a new Stevens EP membrane roofing system over new insulation over the pool roof (10,700 Sq. Ft.).
 
BRUCE DIAMOND CORPORATION
ATTLEBORO, MA

Installed a new Firestone EPDM fully adhered roof system over new insulation on the following sections:
1993 – Section 3 (12,000 Sq. Ft.)
1994 – Middle section (9,800 Sq. Ft.)
1995 – Rear section (17,700 Sq. Ft.)
1997 – Last section (18,000 Sq. Ft.)
1998 – Entrance roof (200 Sq. Ft.)
 

BANK RI
PROVIDENCE, RI

1998 – Installed a new membrane roof system over new insulation on the Johnston, RI, branch (6,000 Sq. Ft.).
1999 – Tore off existing roof and installed a new membrane roof system over new insulation on the Atwood Avenue branch (2,600 Sq. Ft.).
2002 - Reroofed Centerville Road Branch (3000 Sq. Ft.).
2003 - Reroofed Broadway Branch (3800 Sq. Ft.).
2007 - Reroofed Cranston Branch (1600 Sq Ft.).

 
A.T. CROSS
LINCOLN, RI –
FISK BUILDING

1995 – Removed "IRMA" roof and installed a new Stevens EP membrane roof system over new insulation (30,600 Sq. Ft.).

 

about us
our work
service department
testimonials
faqs
infrared moisture analysis
our memberships
manufacturer warranties
history


subscribe
unsubscribe



































Chaffee Industrial Roofing | 193 Amaral Street | East Providence, RI 02915
401.438.1160 | Fax: 401.431.0628 | info@chaffeeroofing.com